Find all the essential bushfire information you need for your project

 FAQs

 
  • This depends on the type and stage of your development. For most new homes in bushfire-prone areas, a BAL (Bushfire Attack Level) Assessment is required to determine the construction standards under AS 3959. A Bushfire Management Plan (BMP) is needed for more complex proposals and is usually required at the planning approval stage—particularly for subdivisions, larger lots, or sites without a reticulated water supply. Developments that involve vulnerable occupants (such as aged care or education facilities) will also require a Bushfire Emergency Plan (BEP), and high-risk land uses (like fuel depots) may need a Bushfire Risk Management Plan (BRMP).

    Still unsure? Contact us and we’ll help determine which report is right for your project.

  • While each report varies, they all typically evaluate:

    • Vegetation type, separation

    • Site Slopes

      A BMP will also cover:

    • Property access for firefighting and evacuation

    • Water availability (e.g. hydrants or tanks)

    Emergency plans like BEPsand BRMPs also assess evacuation strategy, staff training needs, and hazard containment for high-risk or vulnerable use sites.

  • A BAL Assessment is usually needed when applying for a Building Licence. A BMP is typically required earlier—at the planning or subdivision stage—to support a Development Application. BEPs and BRMPs are submitted alongside DAs for vulnerable or high-risk land uses.

  • Your report will include your BAL rating, and potentially a list of bushfire mitigation requirements, such as vegetation clearing, construction upgrades, or water supply improvements if you had a BMP completed.

    These documents will need to be shown in your building or development plans when submitting to council.
    It's important your builder is aware of the BAL rating and conditions early to avoid delays or non-compliance.

  • Only BPAD-accredited practitioners can complete valid bushfire reports.

    • Level 1 & 2 practitioners can prepare BAL Assessments and most BMPs (with sign-off from a senior member where required)

    • Level 3 accreditation is required for BEPs and BRMPs

    Bushfire Smart has one of the few Level 3 practitioners in WA, meaning we can service all report types in-house.

Want some more detailed information?

Read on to find out more!

Compliance & Assessments Jess Calcutt Compliance & Assessments Jess Calcutt

How is a BAL Rating Calculated?

How is your BAL rating actually determined?

A Bushfire Attack Level (BAL) rating is calculated using procedures outlined in AS 3959 – Construction of buildings in bushfire-prone areas. There are two methods available: the Simplified Procedure (Method 1) and the Detailed Procedure (Method 2). In most cases, Method 1 is sufficient, and that’s the focus of this article.

Read More